w0091 Bell Barn Reconstruction 901 Dan Loran 18 Aug 2009
First the outer stones are laid, then the inner core is filled in. (Source, Dan Loran)
            First the outer stones are laid, then the inner core is filled in. (Source, Dan Loran)
Lesia Design is