22 February 2010 - A stockpile of lumber has been stacked on the loft floor for use in building the floor and the roof structure. (Source: Dan Loran)
0509 Bell Barn Restoration 714 Dan Loran 22 Feb 2010
Previous
Previous
0508-Bell-Barn-Restoration-713-Feb.18th-2010-Dan-Loran-18-Feb-2010
Next
Next