6 November 2009 - The first load of concrete is poured and spread onto the Bell Barn floor. (Source: Dan Loran)
w0326 Bell Barn Restoration 3471 Dan Loran 6 Nov 2009
Previous
Previous
w0316-Bell-Barn-Restoration-337-Nov.-5th-20091-Dan-Loran-5-Nov-2009
Next
Next